Exterior Painting Process SOP

Purpose

Standardize residential exterior painting. Exterior paint failures are visible from the street + drive callbacks; prep + correct product selection are non-negotiable.

Scope

Wood, fiber-cement, stucco, brick exterior surfaces. Excludes vinyl siding repainting (special primers required) + metal roofing.

Prerequisites

  • Weather window: 3-5 dry days, temps 50-90°F, low humidity, light wind
  • Pressure washer + power source
  • Paint sprayer (airless, 0.015-0.019 tip) OR brushes + rollers
  • Ladders + scaffolding for high work
  • Drop cloths + plastic to protect landscaping
  • Quality primer (oil-based for raw wood; acrylic for previously-painted)
  • Quality exterior acrylic latex paint
  • 100% acrylic caulk for gaps
  • Wood filler for repairs

Procedure

Phase 1: Inspection + prep (1-3 days)

  1. Walk perimeter: note rot, peeling, mildew, cracks, flashing issues
  2. Document existing color + product if recoating
  3. Photograph problem areas
  4. Brief customer on what needs repair (rot, caulk, glazing) - extra cost
  5. Schedule weather

Phase 2: Pressure wash (1 day)

  1. Use moderate pressure (1,500-2,500 PSI for wood; 2,500-3,500 for masonry)
  2. Detergent or bleach solution for mildew (1:4 bleach/water; rinse thoroughly)
  3. Wash from top down
  4. Don't blast water under siding / into windows
  5. Allow 24-48 hr to dry before paint
  6. Verify dryness with moisture meter (< 15% moisture in wood)

Phase 3: Scrape + sand (1-2 days)

  1. Scrape loose/flaking paint to sound surface
  2. Sand rough edges feather-smooth
  3. Repair rotten wood: epoxy fill or replace
  4. Pre-1978 homes: lead-paint precautions (RRP certification required)

Phase 4: Caulk + fill (1 day)

  1. Caulk all gaps: window/door trim, corners, where dissimilar materials meet
  2. Use 100% acrylic OR siliconized acrylic caulk (not pure silicone - paint won't stick)
  3. Tool caulk smooth with wet finger
  4. Allow 24 hr cure before paint

Phase 5: Prime (1 day)

  1. Spot prime bare wood, scraped areas, repaired wood
  2. Full primer if going from dark to light OR previously stained
  3. Use exterior-grade primer matching topcoat chemistry
  4. Allow recoat time (typically 2-4 hr)

Phase 6: Paint body (1-2 days)

  1. Spray + back-brush (or back-roll) for best adhesion
  • Spray gives speed + uniform coverage
  • Back-brushing forces paint into surface texture
  1. 2 coats standard
  2. Maintain wet edge; don't stop mid-wall
  3. Recoat per manufacturer timing (typically 2-4 hr; never more than 24-36 hr OR add wash step)

Phase 7: Paint trim + accents (1 day)

  1. Cut in carefully where trim meets body
  2. Two coats with light sand between
  3. Window glazing: oil-based glazing compound only paintable when fully cured (weeks)

Phase 8: Cleanup + walkthrough

  1. Remove all drop cloths, masking
  2. Move overspray off windows, AC condensers
  3. Customer walkthrough - point out any issues
  4. Provide warranty (typically 5-7 years on labor)

Surface-specific notes

Wood siding (cedar, pine, fir):

  • Most prep-intensive
  • Spot prime all knots (knots bleed tannin through paint)
  • 2 coats over primer

Fiber cement (Hardie, etc.):

  • Comes pre-primed; topcoat directly
  • Good adhesion; long life
  • 2 coats acrylic latex; expect 10-15 year life

Stucco:

  • Patch cracks before priming
  • Use elastomeric coatings for moderate cracks
  • Use masonry primer
  • Spray + back-roll typical

Brick:

  • Painting brick is sometimes regretted (hard to reverse, traps moisture)
  • If painting: efflorescence cleaner + masonry primer + breathable masonry paint
  • Recommend pressure-wash + tuckpointing alternative

Aluminum siding:

  • Light scuff-sand for adhesion
  • Bond primer
  • 100% acrylic topcoat
  • Expect 10-15 years

Vinyl siding:

  • Special "vinyl-safe" paints only (low heat-absorbing)
  • Light colors only (dark = heat warping)
  • Many factory-finished; painting voids manufacturer warranty

Common pitfalls

  • Painting wet wood: paint blisters in days
  • Painting in direct sun on hot surface: paint dries too fast, doesn't bond
  • Skipping power wash: paint adheres to dirt, peels in 1-2 years
  • Cheap paint: 5-year life vs 10-15 year for quality; costs more long-term
  • Wrong primer: oil paint over latex primer is fine; latex over oil needs bonding primer
  • No back-brushing on sprayed: paint sits on top, doesn't penetrate
  • Painting over peeling: peels return within months
  • Forgetting to prime knots: tannin bleed-through within weeks

Safety + environmental

  • Lead paint (pre-1978): RRP certified, containment, cleanup
  • VOC: latex < 50 g/L; acrylic typically OK; oils higher
  • Ladder safety: 4:1 ratio, tie off
  • Power tools: GFCI protection
  • Pressure washer: never aim at people, electrical, AC condensers

The single highest-impact decision for exterior paint longevity: SPEND THE MONEY ON QUALITY PAINT. A premium acrylic latex outlasts a paint by 5-10 years. Labor cost dominates the total - saving on paint costs in 5 years when the cheap paint fails 5 years early. Spec the good stuff + charge accordingly.

References

  • Paint manufacturer technical data sheets
  • PCA exterior standards
  • EPA RRP rule (for pre-1978 homes)
  • Manuall internal: Surface Prep for Painting, Paint Types + Chemistry Reference